
The first section of the newly created link road from the B 286 to wiesentheid and abtswind has now been inaugurated. However, vehicles are not yet allowed to drive on the section, which serves as a further exit for the expressway: the fine markings are still missing at the intersection, as are the signal loops that will control the future traffic lights there.
Without this the crossing together with the road may not be opened for traffic, it was said. The highly sensitive loops are expected to be installed by the beginning of january, according to frank braun from the engineering office responsible for the project.